Are you considering a bathroom remodel in Sarasota? Whether you’re wanting to update the style or make the space more functional, a bathroom remodel can be a great investment. But before you get too excited about choosing fixtures and tile, you need to know how long it’s going to take.

The answer to how long it takes to remodel a bathroom in Florida depends on a number of factors. The size of the bathroom, the scope of the project, and the availability of materials and labor can all affect the timeline.

In this article, we’ll give you a general idea of how long it takes to remodel a bathroom. We’ll also provide some tips on how to make the process go as smoothly as possible.

General Timeline for a Bathroom Remodel

luxury bathroom remodel in sarasota

The following timeline can serve as a guideline when planning your bathroom remodeling project:

  • Design (one to four weeks): Meet with your contractor to discuss your ideas and budget. Once you have a plan in place, the contractor will draw up a design and provide you with an estimate.
  • Material ordering (one to eight weeks):  After the design is complete, the contractor will order all of the materials needed for the project. This process can take a few weeks to a few months, depending on the availability of materials.
  • Construction (two to five weeks):   Once the materials are delivered, the construction phase will begin. This is typically the shortest phase of the project, but it can take longer if there are any unforeseen circumstances.
  • Finishing touches (one to two weeks): After the construction is complete, the final touches will be made. This includes things like painting, installing fixtures, and adding hardware. Project complete!
  • Remember, these are just general timelines. The actual time it will take to remodel your bathroom will vary based on the size and scope of the project.

Tips for a Quick Bathroom Remodel

Research all areas of remodel

First, research all areas of the remodel before work begins. This will help you to get an understanding of what this process entails, what alternatives exist and estimate costs. Doing so can aid in being more efficient with time and money as your bathroom remodel tutorial is underway.

Plumbing and Electrical Upgrades

Second, most homeowners try not to hide any plumbing or electrical upgrades that need to be done. The last thing anyone wants is for a leaky pipe or faulty wiring to burst open after the newly installed walls are up and painted over! If anything needs fixing, do it now rather than postpone for later.

Any plumbing fixtures must meet city codes in order to pass inspection. Therefore make sure any supplies needed are readily available from your local store before work starts on this vital element of the project. This can mean wasting a lot of time waiting if you leave it until the job begins. It’s always better to plan ahead in detail as much as possible when things such as this are required!

Selecting Materials in Advance

Determine exactly what materials you will be using for the duration of the project. This includes all paint colors, tiling, flooring, fixtures and fittings. Once you know what you need, purchase these in advance so that they’re ready to go when it’s time to start work. This will again save valuable time from being wasted on shopping trips during the remodel.

Prepping the Bathroom Space

Fourth, all surfaces in the bathroom need to be prepared before any work can commence. This means removing old caulk, grout, tile adhesive or anything else that may be in the way. All walls must be stripped back to their bare state so that new materials can be applied easily and evenly. These tasks are very important but often overlooked in a haste to get started on the fun parts!

Avoiding Common Costly Mistakes

Finally, avoid common mistakes that can cause your bathroom renovation costs to spiral out of control! These include things like over-tiling, choosing too many different materials or opting for luxury fixtures and fittings when more affordable options will suffice. Bathroom remodeling can be costly but with a little forethought and planning, it doesn’t have to break the bank.

What are the different factors that affect the timeline of a bathroom remodel?

bathtub vanity bathroom remodel

The Size of the Bathroom:

A small bathroom is defined as containing less than 50 square feet. A medium-sized bathroom is between 51 and 100 square feet, while a large one is over 100 square feet. Obviously, the larger the space, the more time it will  take to complete the project.

The Scope of the Project:

The complexity of the job also affects the timeline. A simple bathroom update (painting, new light fixtures, updated hardware, and a new toilet) can be done relatively quickly. A more complex job that involves moving plumbing or adding square footage will obviously take longer.

Availability of materials and labor:

Another factor that can affect the timeline is the availability of materials and labor. If you’re doing a simple update, you may be able to find the materials you need right away. But if you’re doing a more extensive remodel, you may have to wait for materials to be delivered or for contractors to be available.

The best way to get an accurate timeline for your project is to consult with a contractor. They will be able to give you a more specific idea of how long it will take based on the size and scope of your project.

So…How long will it take to remodel MY bathroom?

bathtub sarasota remodel

Of course, every bathroom is different. The answer really depends on a few factors, such as bathroom size, and how many workers you have doing it. With those things in mind, it can take anywhere from 7 days to 3 months. Before you renovate your bathroom, here are a few things you should keep in mind:

  • A regular bathroom renovation takes approximately one week for a small room, ten days for a medium sized one, and two weeks for larger bathrooms. The drying time needed in-between tiling or laying down new flooring or cabinets is not included in these estimates.
  • Drying time after tiles are installed, countertops put in place, and so on accounts for a significant portion of the overall renovation period. Typically, large projects will be completed anywhere from 18 to 24 days. However, you may not be able to use your new room until the project is fully finished.
  • You’ll experience less construction downtime and weather-related work stoppages if you plan your renovations for the summer months.
  • If you want to do a complete bathroom makeover (not just new paint and towels), then expect the project to take longer.

Conclusion

The time it will take to remodel your bathroom depends on a few factors, such as the size of the room and the scope of the project. Generally speaking, a simple update can be done relatively quickly, while a more complex job that involves moving plumbing or adding square footage will take longer. The best way to get an accurate timeline for your project is to consult with a contractor. They will be able to give you a more specific idea of how long it will take based on the size and scope of your project.

If you’re at all interested in a bathroom remodeling project in Sarasota, be sure to contact us below or give us a call to ask us anything! (941) 248-0301